Sign In | Join Free | My gimpguru.org
China Guangzhou Kinte Electric Industrial Co., LTD logo
Guangzhou Kinte Electric Industrial Co., LTD
Guangzhou Kinte Industrial Co., Ltd.
Verified Supplier

4 Years

Home > Automotive EPC >

Production Line Upgrade/Automotive EPC

Guangzhou Kinte Electric Industrial Co., LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Production Line Upgrade/Automotive EPC

  • 1
  • 2

Brand Name : CEI-Kinte

Model Number : Customized

Certification : ISO9001/FEM/ISO14001/OHSAS 18001

Place of Origin : China

MOQ : Negotiable

Price : Negotiable

Payment Terms : Negotiable

Supply Ability : Strong production capacity

Delivery Time : According to customer's requirement

Packaging Details : Packed with plastic films and wrap with strips

EPC : Engineering Procurement Construction

Press Shop : Consulting

Body Shop : Main/Closures/Floor/Sub-assembly/Metal finishing

Paint Shop : PT/ED Line/Primer Top Paint

Assembly Shop : Trim/Sub-assembly/Testing

Engineering : Plant Planning, R&D, SE

Production capacity : Improvement

Simulation : PDPS

Overall Planning : General Layout, Analysis Drawings

After-sale Service : 24/24 7/7

Contact Now

Introduction Of New Models

Introduction of new models for welding lines, to realize collinear production of new models and original models

Capacity Improvement

Improvement of line productivity, to convert and upgrade the low-beat lines to high-beat lines

Old Line Relocation

Introduction of new models for welding lines, to realize collinear production of new models and original models

Manual Operation Converted To Automatic Operation

Change manual operation to automatic operation. Transform the manual loading station into automatic loading station. Transform the manual welding station into automatic welding station. Transform the manual gluing station into automatic gluing operation, etc.

Intelligent Transformation

By incorporating MISP industrial big data system, the line beats can be optimized and the failure rate can be lower.

TRANSFORMATION PROCESS

01 Preparation Before Transformation

1. Full demonstration and innovation of process plan

2. Sufficient on-site surveying and mapping, logistics confirmation

3. Detailed construction plan

4. Rigorous project plan

5. Personnel and materials management

6. Standard project management; standard documents, SAP

02 Management During Transformation

1. Mobilization before construction

2. Daily work arrangement and confirmation

3. Safety management

4. Emergency plan

5. Logistics support, customer support, logistics support, customer support

03 Summary After Transformation

1. 24-hour production accompany

2. Quick response to problem points

3. Summary and standardization

Production Line Upgrade/Automotive EPCProduction Line Upgrade/Automotive EPC


Product Tags:

ISO9001 Automotive EPC

      

Automotive EPC ISO9001

      

ISO9001 Production Line Upgrade

      
Quality Production Line Upgrade/Automotive EPC wholesale

Production Line Upgrade/Automotive EPC Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Guangzhou Kinte Electric Industrial Co., LTD
*Subject:
*Message:
Characters Remaining: (0/3000)